A typical Montreal renovation timeline runs about 3–5 weeks for a bathroom, 6–9 for a kitchen, and 3–6 months for a whole home — across seven phases from planning and permits to final fixtures. Permits alone take 2–6 weeks, and the city’s transformation permit costs $9.80 per $1,000 of work. Here’s the phase-by-phase breakdown.
Whether you’re upgrading a Plateau duplex or transforming a suburban split-level in Kirkland, every successful project starts with a realistic Montreal renovation timeline. Yet too many homeowners overlook the essential steps between demolition and drywall — and that’s where delays, budget overruns, and headaches begin.
This article breaks down a smart, phase-by-phase renovation timeline specific to Montreal properties — including local permit delays, weather realities, and trade scheduling bottlenecks. Whether you’re hiring a general contractor or coordinating trades yourself, here’s what to expect.
Phase 1: Planning & Permits (2–6 Weeks)
Before you even think about dust masks and hammers, you need plans — and permits. In Montreal, most major renovations require one or both of the following:
Expect longer approval times in historic neighborhoods (like Villeray or Le Plateau-Mont-Royal) or if your project alters structure or façade. The transformation permit itself costs $9.80 for every $1,000 of work, with a $167.40 minimum for a residential building, per the City of Montréal.
Tasks in this phase:
- Hire an architect or designer
- Get plans drawn
- Submit permit applications
- Order lead-time items (windows, flooring, etc.)
Pro tip: Working with a contractor like DemoPrep can speed up permitting by managing drawings and submissions for you.
Phase 2: Demolition (1–2 Weeks)
This is where the transformation begins. A proper demolition includes more than smashing walls — it’s about surgical removal of materials while protecting what stays.
DemoPrep’s Montreal demolition services include:
- Interior gut-outs
- Bathroom and kitchen removal
- Drywall and flooring demo
- Garage or shed removal
We also provide dust barriers, waste bins, and licensed hauling to keep your project safe and legal. Read our guide: Montreal demolition waste rules.
Phase 3: Structural Work (1–3 Weeks)
After demolition, the framing and structure phase begins. This may include:
- New walls or partitions
- Beam and post installs for open-concept layouts
- Window or door relocations
During this time, trades such as plumbers, electricians, and HVAC pros do their “rough-in” installations — meaning they run wires and pipes before walls are closed up.
Common delays: waiting on inspections from Montreal city officials before closing walls.
Phase 4: Insulation & Inspections (3–5 Days)
Once all rough-ins are complete and approved, insulation is installed. In most cases, a building inspector must approve this before drywall goes up.
Tips:
- Use spray foam in hard-to-seal areas (like rim joists)
- Make sure air/vapor barriers comply with Quebec code
Phase 5: Drywall & Finishing (1–2 Weeks)
Now it’s time to close up the walls and start finishing. This includes:
- Hanging and taping drywall
- Mudding, sanding, and priming
- Painting base coats
Humidity can slow drying times, so expect delays if you’re renovating in spring or fall without adequate heat.
Phase 6: Flooring, Trim & Cabinetry (2–4 Weeks)
This phase overlaps with final painting and may include:
- Hardwood or tile installation
- Baseboards and crown molding
- Kitchen cabinet install
- Countertop templating and fabrication
Cabinet shops in Montreal can have lead times of 4–8 weeks, so order early. Appliance and plumbing fixture delivery may also affect timing.
Phase 7: Final Fixtures & Touchups (1 Week)
Final tasks before move-in:
- Install lighting, outlets, and switches
- Connect plumbing fixtures
- Final paint touchups
- Cleanup and client walkthrough
If your reno is being done for resale, this is where staging and photography happen.
Total Timeline: What to Expect
| Renovation Type | Typical Timeline |
|---|---|
| Small Bathroom | 3–5 weeks |
| Kitchen Renovation | 6–9 weeks |
| Full Floor Renovation | 10–14 weeks |
| Whole Home Renovation | 3–6 months |
Tip: Renovating in winter can actually reduce wait times, as contractor demand drops between January and March in Montreal.
Why Trust DemoPrep With Your Timeline?
We’ve completed everything from single-room demolitions to full home rebuilds across Montreal’s boroughs. Our team coordinates all trades, permits, inspections, and material logistics so your Montreal renovation timeline stays on track — and on budget.
Contact us today to start planning your ideal timeline and get a transparent quote for demolition, renovation, or both.